For Certification Bodies
A short briefing for CB sales and channel partners — drawn from the same material on this site. When you have a lead that isn’t ready yet or is shopping registrars, forward the intro. We keep your CB front and center while we get them audit-ready.
Lindsay on LinkedIn MOCG on LinkedInIndustries
Thousands of management systems across almost every industry — many of them integrated systems meeting ISO 13485, AS9100 and ISO 14001 simultaneously.
Standards we implement and support: ISO 9001 · ISO 13485 · AS9100 · ISO 14001 · ISO 17025 · ISO 27001 · ISO 45001 · TS 16949
Device design, device manufacturing, parts manufacturing (medical and non-medical), medical device repair, medical services, and regulatory / supplier environments.
Extrusion & molding, power generation, tooling, paint & coatings, engraving & stamping, rubber & plastics.
Distribution, logistics, construction, automotive, outsourced production, labs & testing — plus ambulance/EMT, translation, transportation, engineering and construction.
Clients
“Using MOCG for our ISO internal audits made our surveillance audits and re-certification a formality.” — Industrial Machinery Manufacturer
How We Prepare Companies for Certification
Every project starts with an upfront evaluation that rates processes against the standard — so the company sees exactly where it stands before implementation spend. Typical path to audit-ready: 18–22 weeks. Each applicable clause is rated: green conformance, yellow minor non-conformance, or red system breakdown — with a recommendation for each.
Where you stand today against the standard — visual, measurable, no guesswork.
A system matched to how the organization actually works, with the implementation team trained from day one.
Lean documentation people actually use — on a visual timeline mapped to every clause of the standard.
Root cause and corrective action systems that stop problems from repeating.
Their own people equipped to audit — plus a deep review before anyone external walks in.
Help choosing the right registrar and walking in over-prepared.
Documentation timeline from the site: develop documentation (~8 weeks) → train people (~2 weeks) → implement & create records to validate (8–12 weeks). Support level is chosen by the client: as-needed, monthly touchpoint, or full project management with MOCG driving the process and writing system documentation.
MOCG can support the manufacturer’s team as Project Manager — or be their ISO team. 100% project success — every project guaranteed; 30+ years; never had a project fail.
For CB sales & channel partners
Cold, shopping, or just not ready yet — we’ll keep your certification body front and center while we get them audit-ready. You keep the certificate and the credit. We do the months of QMS prep and stay out of certification decisions.
Contact MOCG